Power shutdown March 19 in northern Luzon provinces

>> Monday, March 17, 2014


The National Grid Corporation of the Philippines served notice of scheduled shutdown of some of its transmission facilities on March 19 from 7 a.m. to 5 p.m. in Benguet, Baguio City, Mountain Province, Kalinga, Ilocos Sur and Quirino, an NGCP advisory said. 

Power in parts of Benguet Electric Cooperative’s coverage will be shut down which include  Baguio City (Magsaysay Avenue, Happy Homes-Old Lucban, M. Roxas, South Sanitary Camp, Trancoville, Quisumbing, Lower Malvar, Tabora, CamdasSubd., Quirino Hill, Dizon Subd., Pinget, Dreamland Subd., Slaughter Compound, P. Zamora St., Kayang-Hilltop, BPI Cpd., Bokawkan Rd., P. Burgos, Gomez St., Camp Allen, Abanao Street, Kayang, Kagitingan, Yandoc St., City Hall, AZCKO Brgy, Rizal Monument Brgy, Burnham-Legarda, Palma-Urbano, Queen of Peace, City Camp, Rock Quarry, Dr. Carino St., Q.M., Kisad Rd., Legarda Rd., General Lim St., Del Pilar St., BGH Compound, UP Baguio Drive, Gov. Pack Road, PHIL-AM Cpd., Balsigan, Campo Sioco, Imelda Marcos, Sto. Rosario, Old Site SLU-SVP, parts of Bakakeng, Marcos Highway, Kitma, Crystal Cave, Balacbac, Dontogan, Irisan, San Roque, San Luis, Asin, Lourdes Subdivision, Mirador Hill, Dominican Hill, Hamada Subdivision, Tam-awan-Longlong Road, Tacay Road, Quezon Hill, Pinsao, Richwood Subd., Ferguson Road, GuisadSurong,  Fairview, parts of Cresencia Village, Campo Filipino, Avelino St., Sepic Road. and parts of Benguet (Sablan, Tuba, Taloy Sur/Norte, San Pascual and La Trinidad except Beckel.

Also on March 19 from 7 a.m. to 5 p.m., power in entire Mountain Province and nearby provinces will be shut down.

Affected areas include Tinglayan, Kalinga; Cervantes and Quirino, Ilocos Sur and parts of Balili, Mankayan, Benguet

Reason:  annual preventive maintenance of 75MVA power transformer and equipment at La Trinidad substation; simultaneous with line maintenance along La Trinidad – Mountain Province Electric Coop. and La Trinidad - Calot 69kV lines


 Normal operations will immediately resume after work completion. NGCP customers and the general public are advised to take the necessary preparations and precautions for this scheduled interruption. 

0 comments:

  © Blogger templates Palm by Ourblogtemplates.com 2008

Back to TOP  

Web Statistics