DILG sets P28.1 million for Mt Province projects
>> Sunday, August 30, 2015
By Juliet B. Saley
BONTOC, Mountain Province The Department of Interior and Local
government allocated P28.1 million to
finance 20 projects in eight municipalities of the province under its
“bottom-up budgeting (BUB) this year.
DILG provincial office records bared , P6
million was allotted for Sabangan broken
down to P1M each for construction of domestic water systems in barangays
Data and Madepdeppas, P1.5M in Barangay Busa, and P2.5M and barangay
Camatagan.
The municipality of Sagada was allotted P5.1M
for rehabilitation of Pak-et flood control with a project cost of P1.2M,
rehabilitation of Dagdag drainage system (Letang/Daoagan) P1M, rehabilitation of Tabiyo flood
control P1M, construction of Dagdag
small water system level II
P900,000.00, and P500,000.00 each for the construction of Ampatyay water
system, and provision of rescue equipment.
Bontoc was allotted P3,750,000 for
construction and maintenance of Bontoc waterworks (Balabag source) worth
P1,250,000 and construction/improvement of Guina-ang water system P2.5M.
The amount of P3.5M was earmarked
for Natonin town for erosion control.
Paracelis will receive P3M to
finance construction of Bayongyong flood control, and Minangga-Pagga footbridge
with a project cost of P1.5M each. The amount of 2,750,000.00 is
allotted for Barlig for the rehabilitation of Bouman s Trail and
drainage.
The towns of Sadanga and Bauko were
appropriated P2M each for the completion of Demang water system,
and waterworks system in Bagnen Proper(P1M) and Mayag(P.5) and Banao
drainage project(P.5), respectively.
Aside from BUB, the Payapa at
Masaganang Pamayanan DILG fund has
allocated this year the amount of P25 million for the Fabuyan Fangorao road
concreting with riprapping in barangay Maligcong here.
These projects identified in local
poverty reduction action plans of local government units were seen to help
improve living condition of communities.
0 comments:
Post a Comment