Kennon Road opened;P245-M set for slope proj

>> Wednesday, May 24, 2023

TUBA, Benguet – Kennon Road was reopened to vehicles of residents and workers  going to Baguio City at 5 p.m. Tuesday, May 16, after a landslide was cleared which blocked the road here at Camp 6.
    Following this, the Cordillera office of the Department of Public Works and Highways said it will build a P246-million rock shed slope protection along critical area which traverses this town.
    The rock shed will be constructed in site obstructed by collapsed soil due to continuous afternoon rains on May 9.
    The construction of the rock shed was recommended in a geological study and analysis undertaken by consultants in 2017 to address road slides along critical portions of Kennon Road.
    Members of Cordillera Regional Disaster Risk Reduction and Management Council earlier inspected the soil collapse and assess clearing operations.

0 comments:

  © Blogger templates Palm by Ourblogtemplates.com 2008

Back to TOP  

Web Statistics